Call us on telephone icon 01226 785 722

Results

150 Venturi Water Pumps Loaded And Shipped Today

Latest consignment of 150 of our venturi water pumps ready for loading and shipping to the USA today. These pumps have NO moving parts and are cost effective enough for every crew to keep one in the van.

Read More

Guided Thrust Boring – Pull Back Technique – Scarborough

The mts Perforator PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer in Scarborough.

Read More

Using The 75mm Essig ‘Smart’ Mole

Using a 75mm Essig 'Smart' mole purchased from Trenchless Sales UK Ltd last week, they have successfully installed new services underneath a cobbled path, avoiding expensive reinstatement.

Read More

Installing 50m of DN150 Naylor Clay Pipe On The South Coast

Busy times for the Trenchless Group all loaded, equipment setting off from our Barnsley depot travelling to site on the South coast.

Read More

New 10 Tonne Thaler Cable Winch Delivered To Buckhurst

Trenchless Sales UK Ltd had a floodlit start today as Buckhurst Plant Hire picked up their new Jakob Thaler GmbH 10 tonne winch to go straight out on site.

Read More

75mm Essig Smart Mole Kit Going Out For Delivery

Full 75mm Essig smart mole kit going out for delivery today. Safety launcher and pins, ranging rod, optical site lubricator and air hose included.

Read More

TRIC Cable Pipe Bursters

TRIC’s lightweight compact design means that the equipment can be used where conventional pipe bursters just cannot fit. Small enough to be used in manholes and having the power to deliver without the need to dismantle and re-assemble making these tools the first choice for confined space working as well as large diameter projects.

Read More

Thaler Cable Drum Trailers

U-shaped heavy-duty construction is built for big cable drums up to a max. weight of 25 tons and a max. dia. of 4.600 mm. This trailer will be coupled to the towing vehicle by straight drawbar with ring pulling eyelet.

Read More

Installation of DN450 Complete Accurate “straight” Line And Grade

installation complete, DN450 #traceyconcrete jacking pipe installed to accurate "straight" line and grade using our #mtsperforator #guidedaugerboring system.

Read More

Installation Of DN225 Naylor Clay Jacking Pipe

Project completed with the installation of DN225 Naylor clay jacking pipe to accurate "straight" line and grade using our mts Perforator pb85 guided auger boring system.

Read More

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT