The 8th Drive complete at #oxford working at 7m deep out of 2.7m diameter shafts. 37m of DN225 Naylor Industries PLC#clay jacking pipe installed to accurate line and grade using our #perforator#guidedaugerboring system. Now ready to move on to DN300. Trenchless Solutions own and operate the largest fleet of #augerboring rigs within the #UK.