Call us on telephone icon 01226 785 722

News

28th February 2026

Guided Auger Boring Success in Stranraer, Scotland

A recently completed Guided Auger Boring project in Stranraer, Scotland saw the successful installation of 35m of DN225 Steinzeug Keramo vitrified clay jacking pipes delivered across two controlled drives. The 1st crossing facilitated the installation of a new surface water drain from a large retaining pond, designed to manage flood elevation. The 2nd crossing provided […] …

Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT