Call us on telephone icon 01226 785 722

News

5th February 2026

A successful close-out at Eaves Green, Chorley

A successful close-out at Eaves Green, Chorley

Our team has now concluded the guided auger boring works on site, with the installation DN150 & DN225 vitrified clay jacking pipes across 5 drives in total. This project  was delivered to a high standard, reflecting the professionalism, precision and commitment of everyone involved.
Find out how our guided auger boring methods can assist with your next project:

📞01226 785722
📧[email protected]

Share



Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT