Call us on telephone icon 01226 785 722

News

5th January 2026

Another successful Guided Auger Boring installation completed at Cardwell Farm, Preston

This job involved the installation of 30m of DN150 Steinzeug Keramo clay  jacking pipe, delivered with accuracy from start to finish. The controlled nature of the process ensured excellent alignment and a clean, efficient installation with minimal impact on the surrounding area.

The choice of Steinzeug Keramo pipe reflects a commitment to longevity and sustainability, providing the development with a robust, corrosion-resistant solution that will last for generations.

Great work by the site team for navigating the ground conditions and delivering a flawless finish👏

Find out how our guided auger boring methods can assist with your next project:

📞01226 785722
📧[email protected]

Share



Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT