Call us on telephone icon 01226 785 722

News

18th April 2019

3 Drives Installed To Straight Line

Well done lads!!! Naylor Industries Plc DN150 clay jacking pipe!! Great finish to the week 3 drives in total, installed to “straight” line and grade in London using our mts Perforator GmbH guided auger boring equipment. DN150, 225 and 300 in stock now.

Share



Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT