Call us on telephone icon 01226 785 722

News

8th February 2024

The team have done a fantastic job on this project!!

Team Trenchless were employed to install a 610mm steel carrier casing then install a 560mm SDR11 PE pipe from the 6.5m shaft to the underground tank within the WTW. Line and grade was paramount on this project so TSL opted to use the accuracy of our guided auger boring rig. If you have or think […] …

2nd February 2024

Great work lads !!

Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT