Call us on telephone icon 01226 785 722

News

25th July 2022

Here is a Video from a Previous Project That We Did in Scarborough

Here is a video from a previous project that we did in Scarborough. The Perforator GmbH PBA85V guided thrust boring system (pull back technique) was used to install 700m of gravity sewer. 180mm SDR11 black PE pipe was installed to straight accurate line and gradient in various drive lengths between 55 to 65 metres. For […] …

Filter by Division

Archive

Accreditations

  • Acclaim Accreditation

  • Achilles UVDB Verified

  • Constructionline Gold

  • SSIP

  • UKSTT